The renewable power percentage is published each year to set the rate of liability for Renewable Energy Target liable entities under the Large-scale Renewable Energy Target.

The renewable power percentage is a predetermined annual target set to achieve the Large-scale Renewable Energy Target of 33,00​0 gigawatt hours by 2020.

All legislated Large-scale Renewable Energy Targets from 2001 to 2030 are shown in the table below.  

Year Legislated target 2001 (MWh)
as at 1 January 20011
Legislated target 2010 (MWh)
as at 1 February 20102
Legislated target 2011 (MWh)
as at 1 January 20113
(A)
Adjusted target
Number of valid LGCs added to or subtracted4
(B)
Adjusted target
Commencement of waste coal mine gas5
(C)
Adjusted LRET Target (MWh)
Equals (A)+/- (B) + (C)
Current LRET target6 Renewable power percentage
2021-2030N/A45,000,00041,000,000N/AN/A 41,000,000 33,000,000To be specified on or before 31 March in the year
20209,500,00045,850,00041,000,000N/A850,000 41,850,000 33,850,000 To be specified on or before 31 March 2020
20199,500,00041,250,00036,400,000-2,019,000850,000 35,231,000 31,244,000 To be specified on or before 31 March 2019
20189,500,00036,650,00031,800,000-2,019,000850,000 30,631,000 28,637,000 To be specified on or before 31 March 2018
20179,500,00027,050,00027,200,000-2,019,000850,000 26,031,000 26,031,000​ To be specified on or before 31 March 2017
20169,500,00027,450,00022,600,000-2,019,000850,000 21,431,000 21,​431,000 12.75%
20159,500,00022,850,00018,000,000N/A850,00018,850,000 18,850,000 11.11%
20149,500,00020,950,00016,100,000N/A850,000 16,950,000 16,950,000 9.87%
20139,500,00019,050,00014,200,0004,038,000850,000 19,088,000 19,088,000 10.65%
20129,500,00017,150,00012,300,0004,038,000425,000 16,763,000 16,763,000 9.15%
20119,500,00014,825,00010,400,000N/AN/A 10,400,000 10,400,000 5.62%
20109,500,00012,500,00012,500,000N/AN/A 12,500,000 12,500,000 5.98%
20098,100,0008,100,0008,100,000N/AN/A 8,100,000 8,100,000 3.64%
20086,800,0006,800,0006,800,000N/AN/A 6,800,000 6,800,000 3.14%
20075,600,0005,600,0005,600,000N/AN/A 5,600,000 5,600,000 2.70%
20064,500,0004,500,0004,500,000N/AN/A 4,500,000 4,500,000 2.17%
20053,400,0003,400,0003,400,000N/AN/A 3,400,000 3,400,000 1.64%
20042,600,0002,600,0002,600,000N/AN/A 2,600,000 2,600,000 1.25%
20031,800,0001,800,0001,800,000N/AN/A 1,800,000 1,800,000 0.88%
20021,100,0001,100,0001,100,000N/AN/A 1,100,000 1,100,000 0.62%
2001300,000300,000300,000N/AN/A 300,000 300,000 0.24%

Footnotes

1. The legislation first commenced with a renewable energy target from 2001 to 2020. Section 40 of the Renewable Energy (Electricity) Act 2000 No. 174 2000 - C2004A00767 has since been amended.

2. The legislation was amended to increase the renewable energy target and extend the life of the scheme to 2030. Section 40 of the Renewable Energy (Electricity) Act 2000 No. 78 2009 - C2009C00435 has since been amended.

3. The legislation was amended to represent two targets the Large-scale Renewable Energy Target and the Small-scale Renewable Energy Scheme. Section 40 of the Renewable Energy (Electricity) Act 2000 number 69 2010 - C2010C00469.

4. The adjusted target accounts for the number of valid certificates that exceeded 34,500,000 MWh at the end of 2010 (paragraphs 40(1A)(a) and (b) of the Act).

5. The adjusted target accounts for the commencement of waste coal mine gas as an eligible renewable energy source (subsections 40(2) – (5) of the Act).

6. The legislation was amended during 2015 when 100 per cent exemption was provided to companies conducting emission intensive trade exposed activities and eligibility from wood waste was reintroduced. Section 40 of the Renewable Energy (Electricity) Act 2000 number 90 2015 - C2015C00313

Documents on this page Documents on this page

Was this page useful?

LEAVE FEEDBACK
 
 
preload-image-only preload-image-only preload-image-only preload-image-only preload-image-only preload-image-only preload-image-only preload-image-only preload-image-only